USP College Office Refurbishment and Reinstatement

Office refurbishment for an end-of-lease handover

USP College · Castle Point, Essex

AFM refurbished and reinstated an entire floor leased by USP College in a Castle Point Borough Council building. The work brought the premises back to the condition required for handover.

What AFM delivered

  • Installed approximately 34 linear metres of internal glazing with a frosted privacy band.
  • Prepared and levelled the subfloor and replaced approximately 350 m² of commercial carpet tiles.
  • Installed 63 LED ceiling panels and new emergency lighting.
  • Replaced 1,000 suspended ceiling tiles.
  • Built a secure office partition and completed decorating and the final builders’ clean.

The result

AFM coordinated the trades and handed over a refurbished floor ready for the next stage of its use. USP College had one contractor managing the work from preparation through to handover.

Explore our commercial fit-outs, commercial flooring and electrical services, or request a site survey.

Office floor with exposed ceiling grid during refurbishment
During the refurbishment
Reinstated USP College office with new carpet tiles, lighting and suspended ceiling
The reinstated office floor