USP College Office Refurbishment and Reinstatement
Office refurbishment for an end-of-lease handover
USP College · Castle Point, Essex
AFM refurbished and reinstated an entire floor leased by USP College in a Castle Point Borough Council building. The work brought the premises back to the condition required for handover.
What AFM delivered
- Installed approximately 34 linear metres of internal glazing with a frosted privacy band.
- Prepared and levelled the subfloor and replaced approximately 350 m² of commercial carpet tiles.
- Installed 63 LED ceiling panels and new emergency lighting.
- Replaced 1,000 suspended ceiling tiles.
- Built a secure office partition and completed decorating and the final builders’ clean.
The result
AFM coordinated the trades and handed over a refurbished floor ready for the next stage of its use. USP College had one contractor managing the work from preparation through to handover.
Explore our commercial fit-outs, commercial flooring and electrical services, or request a site survey.






